Skip to main content
Loading…
This section is included in your selections.

The mining plan shall, to the extent practicable:

A. Indicate the progression of all operations of the facility indicating time frames for each phase and the estimated life of the operation;

B. Show the location of equipment, offices, stockpiles, settling ponds, interim drainage, machinery and waste dumps, parking and areas to be mined;

C. Indicate the progression of stripping and excavating through the use of cross-sections, elevations and topographic maps;

D. Indicate the time lag between mining and reclamation and equipment siting and removal and/or relocation;

E. Discuss the method of handling simultaneous excavation and reclamation if applicable;

F. Show the location of all streams, roads, railroads, sewage disposal systems, water-wells, and utility facilities within five hundred feet of the site and the location;

G. Indicate the type of and amount of mineral commodities to be removed, the amount of mining waste to be retained on the site and the amount of mining waste to be disposed off site including the method and location of disposal of said mining waste. (Ord. 95-01 § 5, 1995)