Skip to main content
Loading…
This section is included in your selections.

In proximity to the building drain or at a point along the private lateral a cleanout should be provided either at the time of building construction or in the event of a plumbing system remodeling. Generally, acceptable clean outs are installed within five feet of the building foundation and also at the property line. All cleanouts shall conform to applicable local plumbing codes and the city's Standard Specifications. (Ord. 13-03, 2013)